Siromer Flatpack Build

 

Assembling the flatpack is a 10 stage process, each stage lasting approximately one hour.

Stage

Description

1

Familiarise yourself with your construction manual, then unpack the crate.

2

Check tyre pressure. Lift tractor body from crate and bolt on 4 wheels.

3

Attach rear mud guards, roll bar and seat belt anchor points.

4

Attach front weight frame. Insert battery.

5

Attach rear lights, 3 point linkage trailing arms and top link.

6

Apply grease, lubricants and coolant. Fill fuel tank with diesel. Connect battery terminals, prime injector pump. Start engine.

7

Check all bolts for tightness and fluid connections for leaks.

8

Attach engine covering, bonnet & side panels.

9

Connect electrical cables.

10

Inspect tractor prior to use.

If you're feeling creative why not make a trailer from the left over tractor crate.

Agricultural tyres can be doubled using spacers to give more buoyancy, as seen in this picture.

SIROMER TRACTORS

TAYLORS LANE INDUSTRIAL

TAYLORS LANE

PILLING

PR3 6AB

Phone Siromer on 01253 799 029 for more information and a FREE brochure